Adara
Sevilla
SOLARUNDER DEVELOPMENT
■ Peak Power: 15 MWp
■ Nominal Power: –
■ Total Modules: –
This includes investments in renewable energies with a capacity of more than 6.5 gigawatts as well as investments in European real estate with an area of more than 2 million square metres as well as in infrastructure projects worth EUR 1.5 billion.
Sevilla
SOLARUNDER DEVELOPMENT
■ Peak Power: 15 MWp
■ Nominal Power: –
■ Total Modules: –
Huelva
■ Peak Power: 56,2 MWp
■ Nominal Power: 49,5 MW
■ Total Modules: 98.388 Ud
Toledo
■ Peak Power: 27,6 MWp
■ Nominal Power: 21,5 MWn
■ Total Modules: 40.320 ud
Tabernas (Almería)
■ Peak Power: 49,996 kWp
■ Modules: 120,932
■ Surface (ha): 105
Tabernas (Almería)
■ Peak Power: 50 MWp
■ Nominal Power: –
■ Total Modules: –
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud
Toledo
■ Peak Power: 27,6 MWp
■ Nominal Power: 21,5 MWn
■ Total Modules: 40.320 ud
Huelva
■ Peak Power: 56,2 MWp
■ Nominal Power: 49,5 MW
■ Total Modules: 98.388 Ud
Sevilla
SOLARUNDER DEVELOPMENT
■ Peak Power: 15 MWp
■ Nominal Power: –
■ Total Modules: –
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Portugal
■ Peak Power: – 10.800 kWp
■ Nominal Power: – MWn
■ Total Modules: – ud
Huelva
■ Peak Power: 56,2 MWp
■ Nominal Power: 49,5 MW
■ Total Modules: 98.388 Ud
Toledo
■ Peak Power: 27,6 MWp
■ Nominal Power: 21,5 MWn
■ Total Modules: 40.320 ud
Tabernas (Almería)
■ Peak Power: 49,996 kWp
■ Modules: 120,932
■ Surface (ha): 105
Tabernas (Almería)
■ Peak Power: 50 MWp
■ Nominal Power: –
■ Total Modules: –
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud
Toledo
■ Peak Power: 31 MWp
■ Nominal Power: 27,5 MWn
■ Total Modules: 47.760 ud